The project includes supply, installation, testing and commissioning of the equipment necessary for the load transfer and the distribution networks’ reinforcement at the different areas which are the subject of the Project.
The new primary substations which are the subject of this contract are :
1. NPCC Primary
2. GICD Primary
3. GICC Primary
4. MW05 Primary
5. M40 Primary
6. GICB Primary
7. M15 Primary
Some of the existing primary substations and switching stations shall be part of this contract Scope of Works at which some of these primary substations’ loads shall be transferred to the new primary substations.
Energy
Governmental
Abu Dhabi
UAE
2010
2014
AED 42 Million
Abu Dhabi Distribution Company, ADDC
Detailed designs for the proposed load transfer schemes and new network infrastructure schemes
Construction supervision of the work and aligning the same with the construction work of various Primary Substations
DMS
Distribution Networks