The project includes supply, installation, testing and commissioning of the equipment necessary for the load transfer and the distribution networks’ reinforcement at the different areas which are the subject of the Project.
The new primary substations which are the subject of this contract are :
New Shaleela Primary Substation
Shahama II Primary
Shahama III Primary
Khalifa B Primary
Shaleela 2 Primary
Rahba Primary
Some of the existing primary substations and switching stations shall be part of this contract Scope of Works at which some of these primary substations’ loads shall be transferred to the new primary substations.
Energy
Governmental
Abu Dhabi
UAE
2010
2013
AED 40 Million
Abu Dhabi Distribution Company, ADDC
Detailed designs for the proposed load transfer schemes and new network infrastructure schemes
Construction supervision of the work and aligning the same with the construction work of various Primary Substations
DMS
Distribution Networks