Main Objective of this project is to improve the entrance of the “Al Jawf Airport”, provide safe maneuvering at the intersection (as the existing intersection consists of at-grade T-intersection where traffic direct conflicts exists at the main road which is under dualization/ widening), also to provide a freeway along the main road (Sakakah / Duma).
.
Location of the interchange had been selected through coordination with related “Government Agencies” in order to provide access to the Airport, Al Jawf University and to the future district/ roads.
The main components of the Cloverleaf interchange are 2-lane/ 2-way for the main roads (median separated), 2-lane for the ramps and 2-lane for the loops. Shoulders (inner 2m & outer 2.5m) are provided for all roads.
Transportation
Governmental
Al-Jawf
KSA
2006
2007
USD 8 Million
Ministry of Transportion
Reconnaissance study
Survey works
Geotechnical investigation
Roads design
Structural design of bridges
Tender documents
Roads
Bridges