The Scope of work include two main phases:
1.Project Alternatives & Preliminary Design, comprising: data collection, review and assessment of available data, assessment of the existing pumpstation at Al- Baberi, study of alternatives for the project components, including the intake; the first pump station and pipeline to the purification plant; the purification plant; and the transmission lines to the Combination Basin.
Design during this phase covers initial calculations, study of locations, general parameters and specifications, study of initial power requirements, identification of site investigation, economical comparisons of route alternatives and assessment of ecological effects. Based on the techno-economic report, the most suitable alternative will be selected.
2.Detailed Design and Tender documents for project components, in addition to detailed design for local control system. This phase also includes Hydraulic design for the Transmission pipeline, water hammer analyses, and design of cathodic protection.
Review of Geotechnical reports, structural design, piping and all civil and architecture work
Review for the M& E design and specifications
Construction Supervision
Transmission pipelines
purification plants