The project aims to increase the capacity of the seventh water purification plant located north of the city of Buraidah from 50,000 m 3/ day to 200,000 m3/ day.
The project comprises reviewing the designs of the existing plant to determine the possibility of taking advantage of the buildings and the existing equipment, and identify the problems of operation and then complete the designs necessary to reach the required capacity.
Ceramic-filters were used in the treatment system to remove high density salts.
Water and Wastewater
NA
Buraidah
KSA
2014
2020
SR 42.3 Million
Qassim Water Authority
Design review, detailed design necessary to reach the required capacity, construction supervision, testing and commissioning.
Water Supply
Desalination Plants