Masterplan of water, Irrigation Sewage and Road Networks for the New 6th of October City, Egypt

The study aims to prepare master plan for the 70,000 acres city of New 6th of October including the planned priority areas of (Social housing buildings, Sakan Misr, Dry Port, Zone Y1, Administrative Control Authority Land).

Project Info

Business lines

Urban Development

Fund

Governmental

Location

New 6th of October, Giza, Egypt

Country

Egypt

Start Date

2018

End Date

1 Jan, 2019

Value

NA

Client

New Urban Communities Authority

AAW Responsibilities

Preparing the Master plan of the main road network and identifying the typical cross-sections according to the strategic master plan.
Preparing the master plan for the main water and irrigation network, identifying the sources of feeding, and conducting a hydraulic analysis for the main network.
Preparing master plan for the main sewage network, lifting and treatment stations, linking them to each other, and identifying the location and capacity of the treatment plant.
Design and preparation of tender documents for the internal network of priority areas
    - Detailed study of the design of the main road network.
    - Detailed study for the design of water, wastewater and irrigation main lines.

Components

  • Road Networks
  • Water and Irrigation Networks
  • Sewage Networks