Beni Suef 4800 MW Combined Cycle Power Plant – WTP Final Tuning and Operation Services, Egypt

Whereas ElSewedy Electric is facing a problem with the operation of the Water Treatment Plant located in Beni Suef 4800 MW (Combined Cycle Power Plant). ELSewedy Electric requested AAW to provide technical assessment services and recommendation to ensure safe and reliable operation and maintenance for the WTP. AAW concluded the following summary of problems:
Hydraulic problems in the clarifier distribution chamber
The chemical injection point needed to be optimized
The clarifier distribution chamber had a mixing problem
Hydraulic problems in the clarifier inlet and outlet configurations
Problems in the sludge handling system
The chemical system needed to be optimized

Project Info

Business lines

Water and Wastewater

Fund

Governmental

Location

Beni Suef

Country

Egypt

Start Date

2017

End Date

2020

Value

NA

Client

ElSewedy Electric PSP

AAW Responsibilities

Review the current design of the WTP plant process units from process and hydraulic point of view in comparison with the water quality records. 
Restudying/evaluating the chemical dossing system. 
Review the sludge treatment works. 
Proposed the applicable solutions for each problem with related calculations taking into consideration that the plant is already constructed and now under commissioning phase.
Produce a Hydraulic Model for the Project to enhance and support the project calculations and solutions.
Attend meetings and discussions with supplier, if required, to reach final modification inside their guarantees.

Components

Wastewater Treatment Plant
Power Plant